Critical Infrastructure Solar PV Project

Gaza Central Water and Wastewater Treatment Plants Solar Project

A monumental 4.7 MW grid-tied solar system powering essential water and wastewater infrastructure in Palestine.

Swipe
4.7 MWTotal PV Capacity
1 MillionInhabitants Served
$5,067,231Project Value
KfWFunded By
Humanitarian Impact

Clean energy for vital water and wastewater infrastructure.

The Gaza Central Treatment Plant is a critical infrastructure facility designed to serve eleven communities comprising around one million inhabitants. By treating wastewater, the plant significantly improves resource protection, proper water supply conditions, and reduces health risks for the local population.

In a region where electricity is scarce, this sophisticated treatment facility operates as an energy self-sufficient complex. This remarkable achievement is made possible by the integration of a biogas facility and the massive 4.7 MW solar plant.

A critical infrastructure solar project where renewable energy directly supports public health, water protection, and essential community services.
Aerial view of Gaza Central water and wastewater treatment plants with solar PV field
Project Fact Sheet

Core Project Specifications

Key data for the Gaza Central Water and Wastewater Treatment Plants Solar PV Project.

Swipe
LocationPalestine – Gaza
Project CategoryTreatment Plants
Distributed SitesAl-Buriej 3.5 MW and Sheikh Ajleen 1.2 MW
Client & FunderKfW Development Bank / German Government
SupervisorCMWU
Core ComponentsSolar panels and mounting structures manufactured by Philadelphia Solar in Jordan
Project ScopeDesign, Build, Supply, Installation and 3 years O&M
Project Value$5,067,231
Total PV Capacity4.7 MW grid-tied solar PV
Sustainable Infrastructure

Powering Vital Communities

The project connects renewable energy generation with critical water services, environmental protection, and long-term public health resilience.

Water Infrastructure With Human Impact

The solar PV system supports treatment infrastructure serving eleven communities across Gaza. The project contributes to wastewater treatment, better resource protection, improved water supply conditions, and reduced health risks.

1Minhabitants served

Absolute Energy Self-Sufficiency

By integrating solar PV generation with the treatment plant’s wider energy systems, the facility is positioned as an energy self-sufficient complex in a region where reliable electricity supply is a critical challenge.

4.7 MWclean PV capacity
Distributed Solar Sites

Two Sites Working as One Clean Energy Platform

The PV system is distributed between Al-Buriej and Sheikh Ajleen to support essential treatment plant operations across separate sites.

Large solar PV array at Gaza treatment plant site
Solar PV Field

Al-Buriej Solar Site

A large PV field deployed to support the treatment plant’s electricity needs, forming the major part of the total distributed solar capacity.

3.5 MW site capacity
Solar PV field integrated near Gaza treatment plant infrastructure
Integrated Plant Energy

Sheikh Ajleen Solar Site

Solar generation integrated with treatment facility infrastructure to support local energy self-sufficiency and reliable plant operation.

1.2 MW site capacity
Advanced Engineering

Grid Synchronization and Turnkey EPC Execution

Philadelphia Solar delivered a highly coordinated grid-tied PV system designed for critical infrastructure performance, durability, and long-term operation.

Top-down view of circular water treatment tanks at Gaza Central treatment plant
Hybrid Synchronization

Seamless Grid-Tied Integration

The 4.7 MW PV grid-tied system is distributed across two main sites, with synchronization works between the new PV system and the two already installed diesel generators at each site separately.

Close aerial view of solar PV rows at Gaza treatment plant solar site
Local Manufacturing

Philadelphia Solar Panels and Structures

The project utilizes high-quality Jordanian solar panels and robust steel mounting structures manufactured and supplied by Philadelphia Solar to ensure durability and reliable energy yield.

Concrete water treatment channels at Gaza central wastewater treatment plant
Clean Energy Export

Surplus Power Supporting Households

The integrated renewable plants produce more electricity than the whole complex consumes itself. Surplus power generated by the solar PV system is sold back to GEDCO to help supply electricity for households across Gaza.

Scope of Delivery

Design, Build, Supply, Installation and O&M

A complete turnkey scope covering the technical backbone of a critical infrastructure solar plant.

Design

Engineering and system design for a distributed grid-tied PV plant.

Supply

PV modules and steel mounting structures supplied by Philadelphia Solar.

Installation

Turnkey implementation across treatment plant solar PV sites.

3 Years O&M

Operation and maintenance support for long-term plant reliability.

Critical Infrastructure Solar

Solar PV Solutions for Essential Public Infrastructure

Philadelphia Solar delivers bankable solar modules, mounting structures, and turnkey renewable energy solutions for infrastructure, utility, and mission-critical facilities.